Reply To: Washtenaw ADV ride

Home Forums Rides! Washtenaw ADV ride Reply To: Washtenaw ADV ride

#23089
Larry Benitz

    I pre-road the Washtenaw ADV Route and found a couple improvements.  Bowdish road is closed as there is a concrete bridge about 12 feet long that is no longer safe for vehicle traffic.  Bowdish is a good and the bridge is passable on a GS.  For those who may wish to skip being such a rebel, I have included a small second track “Skip Bowdish” that diverts from the ride route/track to skip Bowdish and the bridge.   It took about 2 1/2 hours to complete the route riding non-stop, so we should finish at the Pinckney town square around noon or noon-thirty.

    The revised route/track can be downloaded from the GPS Forum.