Home › Forums › GPS Discussion › 2022 Washtenaw ADV Route & Track › Reply To: 2022 Washtenaw ADV Route & Track
July 5, 2022 at 6:56 pm
#23087

I pre-road the Washtenaw ADV Route and found a couple improvements. Bowdish road is closed as there is a concrete bridge about 12 feet long that is no longer safe for vehicle traffic. Bowdish is a good and the bridge is passable on a GS. For those who may wish to skip being such a rebel, I have included a small second track “Skip Bowdish” that diverts from the ride route/track to skip Bowdish and the bridge. It took about 2 1/2 hours to complete the route riding non-stop, so we should finish at the Pinckney town square around noon or noon-thirty.
Please download and load this revised route/track.