Reply To: 2022 Washtenaw ADV Route & Track

Home Forums GPS Discussion 2022 Washtenaw ADV Route & Track Reply To: 2022 Washtenaw ADV Route & Track

#23087
Larry Benitz

I pre-road the Washtenaw ADV Route and found a couple improvements.  Bowdish road is closed as there is a concrete bridge about 12 feet long that is no longer safe for vehicle traffic.  Bowdish is a good and the bridge is passable on a GS.  For those who may wish to skip being such a rebel, I have included a small second track “Skip Bowdish” that diverts from the ride route/track to skip Bowdish and the bridge.   It took about 2 1/2 hours to complete the route riding non-stop, so we should finish at the Pinckney town square around noon or noon-thirty.

Please download and load this revised route/track.

Attachments:
You must be logged in to view attached files.