Reply To: Oakland ADV Ride – Moved to Sept 25

Home Forums Rides! Oakland ADV Ride – Moved to Sept 25 Reply To: Oakland ADV Ride – Moved to Sept 25

#21420
Mats Ceder

I should be able to do the 25th.

Steve, Its easy gravel road riding, and if the route is not changed, street tires works perfect.  I rode it twice in the spring when I was breaking in the bike, both on street tires. Its normally a fun ride with a fun group of riders